amenc

  1. G

    R8.P1.T1.Amenc_Ch4_RISK_MGMT_Topic:INFORMATION_RATIO_RESIDUAL vs_ACTIVE

    In reference to R8.P1.T1.Amenc_Ch4_RISK_MGMT_Topic:INFORMATION_RATIO_RESIDUAL vs_ACTIVE: The Residual Risk is the idiosyncratic Risk = any risk which is not the Systemic Risk and that Total Risk = Systemic Risk + Residual Risk. Having said that though, I am trying to get the standardized...
Top